Brazil vs North Macedonia: Annual change in primary energy from nuclear

Brazil
0.0925 terawatt-hours
in 2025
North Macedonia
0 terawatt-hours
in 2025
Brazil rank
19th
North Macedonia rank
20th

Annual change in primary energy from nuclear over time

  • Brazil
  • North Macedonia
-1001020196619952025

How they compare

Brazil currently reports 0.0925 terawatt-hours against 0 terawatt-hours in North Macedonia, a difference of 0.0925 terawatt-hours.

The two have swapped places 19 times across 35 shared years of data; in 1991 it was North Macedonia ahead.

Brazil ranks 19th and North Macedonia ranks 20th of 215 countries.

Across the 4 decades both report, Brazil averaged higher in 3 and North Macedonia in 1.

Head to head by decade

Decade Brazil North Macedonia Difference Ahead
1990s 0.5859 terawatt-hours 0 terawatt-hours 0.5859 terawatt-hours Brazil
2000s 2.72 terawatt-hours 0 terawatt-hours 2.72 terawatt-hours Brazil
2010s 0.9612 terawatt-hours 0 terawatt-hours 0.9612 terawatt-hours Brazil
2020s -0.1674 terawatt-hours 0 terawatt-hours 0.1674 terawatt-hours North Macedonia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy from nuclear, Brazil or North Macedonia?
Brazil, at 0.0925 terawatt-hours against 0 terawatt-hours in North Macedonia as of 2025.
What is the difference in annual change in primary energy from nuclear between Brazil and North Macedonia?
0.0925 terawatt-hours, with Brazil ahead.
How many years of comparable data are there for Brazil and North Macedonia?
35 years are reported by both, from 1991 to 2025.
How do Brazil and North Macedonia rank globally for annual change in primary energy from nuclear?
Brazil ranks 19th and North Macedonia ranks 20th of 215 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Annual change in primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brazil vs North Macedonia: Annual change in primary energy from nuclear. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 17 August 2026, from https://energy.statizoid.com/compare/annual-change-nuclear/brazil/north-macedonia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/annual-change-nuclear/brazil/north-macedonia/">Brazil vs North Macedonia: Annual change in primary energy from nuclear</a> β€” Statizoid

About this data

Indicator
Annual change in primary energy from nuclear
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
221 places, 10,533 data points, 1966–2025
Last refreshed

Change in total energy supply relative to the previous year, measured in terawatt-hours.