Curacao vs French Polynesia: Annual change in primary energy from nuclear
Curacao
0 terawatt-hours
in 2025
French Polynesia
0 terawatt-hours
in 2024
Curacao rank
19th
French Polynesia rank
19th
Annual change in primary energy from nuclear over time
- Curacao
- French Polynesia
How they compare
Curacao currently reports 0 terawatt-hours against 0 terawatt-hours in French Polynesia, a difference of 0 terawatt-hours.
Across all 12 years both countries report, French Polynesia has been ahead every year.
Curacao ranks 19th and French Polynesia ranks 19th of 218 countries.
Head to head by decade
| Decade | Curacao | French Polynesia | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher annual change in primary energy from nuclear, Curacao or French Polynesia?
- Curacao, at 0 terawatt-hours against 0 terawatt-hours in French Polynesia as of 2025.
- What is the difference in annual change in primary energy from nuclear between Curacao and French Polynesia?
- 0 terawatt-hours, with Curacao ahead.
- How many years of comparable data are there for Curacao and French Polynesia?
- 12 years are reported by both, from 2013 to 2024.
- How do Curacao and French Polynesia rank globally for annual change in primary energy from nuclear?
- Curacao ranks 19th and French Polynesia ranks 19th of 218 countries.
- Where does this data come from?
- Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Annual change in primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Change in total energy supply relative to the previous year, measured in terawatt-hours.