Kyrgyz Republic vs Malta: Annual change in primary energy from nuclear

Kyrgyz Republic
0 terawatt-hours
in 2024
Malta
0 terawatt-hours
in 2024
Kyrgyz Republic rank
20th
Malta rank
20th

Annual change in primary energy from nuclear over time

  • Kyrgyz Republic
  • Malta
00.20.40.60.81198120022024

How they compare

Kyrgyz Republic currently reports 0 terawatt-hours against 0 terawatt-hours in Malta, a difference of 0 terawatt-hours.

Across all 32 years both countries report, Malta has been ahead every year.

Kyrgyz Republic ranks 20th and Malta ranks 20th of 215 countries.

Head to head by decade

Decade Kyrgyz Republic Malta Difference Ahead
1990s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy from nuclear, Kyrgyz Republic or Malta?
Kyrgyz Republic, at 0 terawatt-hours against 0 terawatt-hours in Malta as of 2024.
What is the difference in annual change in primary energy from nuclear between Kyrgyz Republic and Malta?
0 terawatt-hours, with Kyrgyz Republic ahead.
How many years of comparable data are there for Kyrgyz Republic and Malta?
32 years are reported by both, from 1993 to 2024.
How do Kyrgyz Republic and Malta rank globally for annual change in primary energy from nuclear?
Kyrgyz Republic ranks 20th and Malta ranks 20th of 215 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Annual change in primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kyrgyz Republic vs Malta: Annual change in primary energy from nuclear. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 18 August 2026, from https://energy.statizoid.com/compare/annual-change-nuclear/kyrgyz-republic/malta/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/annual-change-nuclear/kyrgyz-republic/malta/">Kyrgyz Republic vs Malta: Annual change in primary energy from nuclear</a> β€” Statizoid

About this data

Indicator
Annual change in primary energy from nuclear
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
221 places, 10,533 data points, 1966–2025
Last refreshed

Change in total energy supply relative to the previous year, measured in terawatt-hours.