Libya vs St. Pierre and Miquelon: Annual change in primary energy from nuclear

Libya
0 terawatt-hours
in 2025
St. Pierre and Miquelon
0 terawatt-hours
in 2024
Libya rank
20th
St. Pierre and Miquelon rank
20th

Annual change in primary energy from nuclear over time

  • Libya
  • St. Pierre and Miquelon
00.20.40.60.81196619952025

How they compare

Libya currently reports 0 terawatt-hours against 0 terawatt-hours in St. Pierre and Miquelon, a difference of 0 terawatt-hours.

Across all 44 years both countries report, St. Pierre and Miquelon has been ahead every year.

Libya ranks 20th and St. Pierre and Miquelon ranks 20th of 215 countries.

Head to head by decade

Decade Libya St. Pierre and Miquelon Difference Ahead
1980s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
1990s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy from nuclear, Libya or St. Pierre and Miquelon?
Libya, at 0 terawatt-hours against 0 terawatt-hours in St. Pierre and Miquelon as of 2025.
What is the difference in annual change in primary energy from nuclear between Libya and St. Pierre and Miquelon?
0 terawatt-hours, with Libya ahead.
How many years of comparable data are there for Libya and St. Pierre and Miquelon?
44 years are reported by both, from 1981 to 2024.
How do Libya and St. Pierre and Miquelon rank globally for annual change in primary energy from nuclear?
Libya ranks 20th and St. Pierre and Miquelon ranks 20th of 215 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Annual change in primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Libya vs St. Pierre and Miquelon: Annual change in primary energy from nuclear. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 18 August 2026, from https://energy.statizoid.com/compare/annual-change-nuclear/libya/saint-pierre-and-miquelon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/annual-change-nuclear/libya/saint-pierre-and-miquelon/">Libya vs St. Pierre and Miquelon: Annual change in primary energy from nuclear</a> β€” Statizoid

About this data

Indicator
Annual change in primary energy from nuclear
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
221 places, 10,533 data points, 1966–2025
Last refreshed

Change in total energy supply relative to the previous year, measured in terawatt-hours.