China vs India: Coal reserves

China
157.04 billion tonnes
in 2023
India
127.73 billion tonnes
in 2023
China rank
3rd
India rank
5th

Coal reserves over time

  • China
  • India
050.0B100.0B150.0B200820152023

How they compare

China currently reports 157.04 billion tonnes against 127.73 billion tonnes in India, a difference of 29.31 billion tonnes.

That makes China's figure about 1.2 times India's.

Across all 16 years both countries report, China has been ahead every year.

China ranks 3rd and India ranks 5th of 216 countries.

China has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade China India Difference Ahead
2000s 114.50 billion tonnes 78.81 billion tonnes 35.69 billion tonnes China
2010s 129.48 billion tonnes 92.89 billion tonnes 36.59 billion tonnes China
2020s 150.12 billion tonnes 119.39 billion tonnes 30.73 billion tonnes China

Averages of every year both report within each decade.

Frequently asked questions

Which has higher coal reserves, China or India?
China, at 157.04 billion tonnes against 127.73 billion tonnes in India as of 2023.
What is the difference in coal reserves between China and India?
29.31 billion tonnes, with China ahead.
How many years of comparable data are there for China and India?
16 years are reported by both, from 2008 to 2023.
How do China and India rank globally for coal reserves?
China ranks 3rd and India ranks 5th of 216 countries.
Where does this data come from?
U.S. Energy Information Administration (2026) – with major processing by Our World in Data, published as Coal reserves. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Coal reserves
Unit
tonnes
Source
U.S. Energy Information Administration (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 3,421 data points, 2008–2023
Last refreshed

Proved reserves, measured in tonnes, are generally those quantities that can be recovered in the future from known reservoirs under existing economic and operating conditions, according to geological and engineering information.