Aruba vs Martinique: Installed wind energy capacity
Aruba
0.02 gigawatts
in 2025
Martinique
0.014 gigawatts
in 2025
Aruba rank
97th
Martinique rank
100th
Installed wind energy capacity over time
- Aruba
- Martinique
How they compare
Aruba currently reports 0.02 gigawatts against 0.014 gigawatts in Martinique, a difference of 0.006 gigawatts.
That makes Aruba's figure about 1.4 times Martinique's.
Across all 17 years both countries report, Aruba has been ahead every year.
Aruba ranks 97th and Martinique ranks 100th of 157 countries.
Aruba has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Aruba | Martinique | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.03 gigawatts | 0.0011 gigawatts | 0.0289 gigawatts | Aruba |
| 2010s | 0.03 gigawatts | 0.0024 gigawatts | 0.0276 gigawatts | Aruba |
| 2020s | 0.0283 gigawatts | 0.0142 gigawatts | 0.0141 gigawatts | Aruba |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher installed wind energy capacity, Aruba or Martinique?
- Aruba, at 0.02 gigawatts against 0.014 gigawatts in Martinique as of 2025.
- What is the difference in installed wind energy capacity between Aruba and Martinique?
- 0.006 gigawatts, with Aruba ahead.
- How many years of comparable data are there for Aruba and Martinique?
- 17 years are reported by both, from 2009 to 2025.
- How do Aruba and Martinique rank globally for installed wind energy capacity?
- Aruba ranks 97th and Martinique ranks 100th of 157 countries.
- Where does this data come from?
- IRENA (2026) β processed by Our World in Data, published as Installed wind energy capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Total wind (on- and off-grid) electricity installed capacity, measured in gigawatts. This includes onshore and offshore wind.