Gibraltar vs Saint Kitts and Nevis: Elec fossil nuclear renewables
Gibraltar
0.22
in 2024
Saint Kitts and Nevis
0.21
in 2024
Gibraltar rank
166th
Saint Kitts and Nevis rank
167th
Elec fossil nuclear renewables over time
- Gibraltar
- Saint Kitts and Nevis
How they compare
Gibraltar currently reports 0.22 against 0.21 in Saint Kitts and Nevis, a difference of 0.01.
The two have swapped places 5 times across 25 shared years of data; in 2000 it was Saint Kitts and Nevis ahead.
Gibraltar ranks 166th and Saint Kitts and Nevis ranks 167th of 208 countries.
Across the 3 decades both report, Gibraltar averaged higher in 1 and Saint Kitts and Nevis in 2.
Head to head by decade
| Decade | Gibraltar | Saint Kitts and Nevis | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.145 | 0.186 | 0.041 | Saint Kitts and Nevis |
| 2010s | 0.2 | 0.215 | 0.015 | Saint Kitts and Nevis |
| 2020s | 0.22 | 0.21 | 0.01 | Gibraltar |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher elec fossil nuclear renewables, Gibraltar or Saint Kitts and Nevis?
- Gibraltar, at 0.22 against 0.21 in Saint Kitts and Nevis as of 2024.
- What is the difference in elec fossil nuclear renewables between Gibraltar and Saint Kitts and Nevis?
- 0.01, with Gibraltar ahead.
- How many years of comparable data are there for Gibraltar and Saint Kitts and Nevis?
- 25 years are reported by both, from 2000 to 2024.
- How do Gibraltar and Saint Kitts and Nevis rank globally for elec fossil nuclear renewables?
- Gibraltar ranks 166th and Saint Kitts and Nevis ranks 167th of 208 countries.
- Where does this data come from?
- Our World in Data, published as Elec fossil nuclear renewables. Statizoid refreshes it automatically from the source and publishes the full history for both places.