Eswatini vs Honduras: Electricity generation from coal
Eswatini
0.02 terawatt-hours
in 2024
Honduras
0.06 terawatt-hours
in 2024
Eswatini rank
80th
Honduras rank
77th
Electricity generation from coal over time
- Eswatini
- Honduras
How they compare
Honduras currently reports 0.06 terawatt-hours against 0.02 terawatt-hours in Eswatini, a difference of 0.04 terawatt-hours.
That makes Honduras's figure about 3.0 times Eswatini's.
The two have swapped places 3 times across 25 shared years of data; in 2000 it was Eswatini ahead.
Eswatini ranks 80th and Honduras ranks 77th of 207 countries.
Across the 3 decades both report, Eswatini averaged higher in 1 and Honduras in 2.
Head to head by decade
| Decade | Eswatini | Honduras | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0.013 terawatt-hours | 0 terawatt-hours | 0.013 terawatt-hours | Eswatini |
| 2010s | 0.021 terawatt-hours | 0.061 terawatt-hours | 0.04 terawatt-hours | Honduras |
| 2020s | 0.02 terawatt-hours | 0.06 terawatt-hours | 0.04 terawatt-hours | Honduras |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from coal, Eswatini or Honduras?
- Honduras, at 0.06 terawatt-hours against 0.02 terawatt-hours in Eswatini as of 2024.
- What is the difference in electricity generation from coal between Eswatini and Honduras?
- 0.04 terawatt-hours, with Honduras ahead.
- How many years of comparable data are there for Eswatini and Honduras?
- 25 years are reported by both, from 2000 to 2024.
- How do Eswatini and Honduras rank globally for electricity generation from coal?
- Eswatini ranks 80th and Honduras ranks 77th of 207 countries.
- Where does this data come from?
- Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from coal. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.