American Samoa vs Saint Martin (French Part): Electricity Generation, Gigawatt hours

American Samoa
130.36
in 2022
Saint Martin (French Part)
183.91
in 2022
American Samoa rank
182nd
Saint Martin (French Part) rank
179th

Electricity Generation, Gigawatt hours over time

  • American Samoa
  • Saint Martin (French Part)
050100150200200020112022

How they compare

Saint Martin (French Part) currently reports 183.91 against 130.36 in American Samoa, a difference of 53.55.

That makes Saint Martin (French Part)'s figure about 1.4 times American Samoa's.

The two have swapped places 3 times across 23 shared years of data; in 2000 it was American Samoa ahead.

American Samoa ranks 182nd and Saint Martin (French Part) ranks 179th of 224 countries.

Across the 3 decades both report, American Samoa averaged higher in 1 and Saint Martin (French Part) in 2.

Head to head by decade

Decade American Samoa Saint Martin (French Part) Difference Ahead
2000s 182.2 150.81 31.38 American Samoa
2010s 159.31 187.08 27.77 Saint Martin (French Part)
2020s 158.11 179.69 21.58 Saint Martin (French Part)

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, American Samoa or Saint Martin (French Part)?
Saint Martin (French Part), at 183.91 against 130.36 in American Samoa as of 2022.
What is the difference in electricity generation, gigawatt hours between American Samoa and Saint Martin (French Part)?
53.55, with Saint Martin (French Part) ahead.
How many years of comparable data are there for American Samoa and Saint Martin (French Part)?
23 years are reported by both, from 2000 to 2022.
How do American Samoa and Saint Martin (French Part) rank globally for electricity generation, gigawatt hours?
American Samoa ranks 182nd and Saint Martin (French Part) ranks 179th of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

American Samoa vs Saint Martin (French Part): Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 13 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/american-samoa/st-martin-french-part/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/american-samoa/st-martin-french-part/">American Samoa vs Saint Martin (French Part): Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.