Belize vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours

Belize
48.2
in 2022
Saint Pierre and Miquelon
49.72
in 2022
Belize rank
203rd
Saint Pierre and Miquelon rank
202nd

Electricity Generation, Gigawatt hours over time

  • Belize
  • Saint Pierre and Miquelon
050100150200200020112022

How they compare

Saint Pierre and Miquelon currently reports 49.72 against 48.2 in Belize, a difference of 1.52.

The two have swapped places 9 times across 23 shared years of data; in 2000 it was Belize ahead.

Belize ranks 203rd and Saint Pierre and Miquelon ranks 202nd of 224 countries.

Across the 3 decades both report, Belize averaged higher in 2 and Saint Pierre and Miquelon in 1.

Head to head by decade

Decade Belize Saint Pierre and Miquelon Difference Ahead
2000s 88.99 41.77 47.22 Belize
2010s 62.24 47.37 14.87 Belize
2020s 47.63 50.54 2.91 Saint Pierre and Miquelon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Belize or Saint Pierre and Miquelon?
Saint Pierre and Miquelon, at 49.72 against 48.2 in Belize as of 2022.
What is the difference in electricity generation, gigawatt hours between Belize and Saint Pierre and Miquelon?
1.52, with Saint Pierre and Miquelon ahead.
How many years of comparable data are there for Belize and Saint Pierre and Miquelon?
23 years are reported by both, from 2000 to 2022.
How do Belize and Saint Pierre and Miquelon rank globally for electricity generation, gigawatt hours?
Belize ranks 203rd and Saint Pierre and Miquelon ranks 202nd of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Belize vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 08 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/belize/saint-pierre-and-miquelon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/belize/saint-pierre-and-miquelon/">Belize vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.