Comoros vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours

Comoros
50.12
in 2022
Saint Pierre and Miquelon
49.72
in 2022
Comoros rank
201st
Saint Pierre and Miquelon rank
202nd

Electricity Generation, Gigawatt hours over time

  • Comoros
  • Saint Pierre and Miquelon
0204060200020112022

How they compare

Comoros currently reports 50.12 against 49.72 in Saint Pierre and Miquelon, a difference of 0.4.

The two have swapped places 7 times across 23 shared years of data; in 2000 it was Saint Pierre and Miquelon ahead.

Comoros ranks 201st and Saint Pierre and Miquelon ranks 202nd of 224 countries.

Across the 3 decades both report, Comoros averaged higher in 1 and Saint Pierre and Miquelon in 2.

Head to head by decade

Decade Comoros Saint Pierre and Miquelon Difference Ahead
2000s 36.68 41.77 5.08 Saint Pierre and Miquelon
2010s 52.64 47.37 5.27 Comoros
2020s 50.12 50.54 0.4213 Saint Pierre and Miquelon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Comoros or Saint Pierre and Miquelon?
Comoros, at 50.12 against 49.72 in Saint Pierre and Miquelon as of 2022.
What is the difference in electricity generation, gigawatt hours between Comoros and Saint Pierre and Miquelon?
0.4, with Comoros ahead.
How many years of comparable data are there for Comoros and Saint Pierre and Miquelon?
23 years are reported by both, from 2000 to 2022.
How do Comoros and Saint Pierre and Miquelon rank globally for electricity generation, gigawatt hours?
Comoros ranks 201st and Saint Pierre and Miquelon ranks 202nd of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 10 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/comoros/saint-pierre-and-miquelon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/comoros/saint-pierre-and-miquelon/">Comoros vs Saint Pierre and Miquelon: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.