Grenada vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours

Grenada
247.65
in 2022
Turks and Caicos Islands
261
in 2022
Grenada rank
174th
Turks and Caicos Islands rank
172nd

Electricity Generation, Gigawatt hours over time

  • Grenada
  • Turks and Caicos Islands
100150200250300200020112022

How they compare

Turks and Caicos Islands currently reports 261 against 247.65 in Grenada, a difference of 13.35.

That makes Turks and Caicos Islands's figure about 1.1 times Grenada's.

The two have swapped places 1 time across 23 shared years of data; in 2000 it was Grenada ahead.

Grenada ranks 174th and Turks and Caicos Islands ranks 172nd of 224 countries.

Across the 3 decades both report, Grenada averaged higher in 1 and Turks and Caicos Islands in 2.

Head to head by decade

Decade Grenada Turks and Caicos Islands Difference Ahead
2000s 165.33 134.44 30.89 Grenada
2010s 212.06 234.6 22.54 Turks and Caicos Islands
2020s 233.1 259.67 26.57 Turks and Caicos Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Grenada or Turks and Caicos Islands?
Turks and Caicos Islands, at 261 against 247.65 in Grenada as of 2022.
What is the difference in electricity generation, gigawatt hours between Grenada and Turks and Caicos Islands?
13.35, with Turks and Caicos Islands ahead.
How many years of comparable data are there for Grenada and Turks and Caicos Islands?
23 years are reported by both, from 2000 to 2022.
How do Grenada and Turks and Caicos Islands rank globally for electricity generation, gigawatt hours?
Grenada ranks 174th and Turks and Caicos Islands ranks 172nd of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 09 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/grenada/turks-and-caicos-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/grenada/turks-and-caicos-islands/">Grenada vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.