Micronesia, Federated States of vs Solomon Islands: Electricity Generation, Gigawatt hours

Micronesia, Federated States of
87.91
in 2022
Solomon Islands
95.96
in 2022
Micronesia, Federated States of rank
194th
Solomon Islands rank
191st

Electricity Generation, Gigawatt hours over time

  • Micronesia, Federated States of
  • Solomon Islands
020406080100200020112022

How they compare

Solomon Islands currently reports 95.96 against 87.91 in Micronesia, Federated States of, a difference of 8.05.

That makes Solomon Islands's figure about 1.1 times Micronesia, Federated States of's.

The two have swapped places 1 time across 23 shared years of data; in 2000 it was Micronesia, Federated States of ahead.

Micronesia, Federated States of ranks 194th and Solomon Islands ranks 191st of 224 countries.

Across the 3 decades both report, Micronesia, Federated States of averaged higher in 1 and Solomon Islands in 2.

Head to head by decade

Decade Micronesia, Federated States of Solomon Islands Difference Ahead
2000s 85.95 65.61 20.34 Micronesia, Federated States of
2010s 63.61 87.66 24.04 Solomon Islands
2020s 80.89 96.72 15.83 Solomon Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Micronesia, Federated States of or Solomon Islands?
Solomon Islands, at 95.96 against 87.91 in Micronesia, Federated States of as of 2022.
What is the difference in electricity generation, gigawatt hours between Micronesia, Federated States of and Solomon Islands?
8.05, with Solomon Islands ahead.
How many years of comparable data are there for Micronesia, Federated States of and Solomon Islands?
23 years are reported by both, from 2000 to 2022.
How do Micronesia, Federated States of and Solomon Islands rank globally for electricity generation, gigawatt hours?
Micronesia, Federated States of ranks 194th and Solomon Islands ranks 191st of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Micronesia, Federated States of vs Solomon Islands: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 05 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/micronesia-fed-sts/solomon-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/micronesia-fed-sts/solomon-islands/">Micronesia, Federated States of vs Solomon Islands: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.