North Macedonia vs Slovenia: Electricity Generation, Gigawatt hours

North Macedonia
4,337
in 2022
Slovenia
3,677
in 2022
North Macedonia rank
98th
Slovenia rank
101st

Electricity Generation, Gigawatt hours over time

  • North Macedonia
  • Slovenia
02.0k4.0k6.0k200020112022

How they compare

North Macedonia currently reports 4,337 against 3,677 in Slovenia, a difference of 660.

That makes North Macedonia's figure about 1.2 times Slovenia's.

The two have swapped places 2 times across 23 shared years of data; in 2000 it was North Macedonia ahead.

North Macedonia ranks 98th and Slovenia ranks 101st of 224 countries.

Slovenia has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade North Macedonia Slovenia Difference Ahead
2000s 5,458 5,612 153.6 Slovenia
2010s 4,361 5,261 900.47 Slovenia
2020s 4,027 4,353 325.93 Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, North Macedonia or Slovenia?
North Macedonia, at 4,337 against 3,677 in Slovenia as of 2022.
What is the difference in electricity generation, gigawatt hours between North Macedonia and Slovenia?
660, with North Macedonia ahead.
How many years of comparable data are there for North Macedonia and Slovenia?
23 years are reported by both, from 2000 to 2022.
How do North Macedonia and Slovenia rank globally for electricity generation, gigawatt hours?
North Macedonia ranks 98th and Slovenia ranks 101st of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

North Macedonia vs Slovenia: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 10 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/north-macedonia/slovenia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/north-macedonia/slovenia/">North Macedonia vs Slovenia: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.