Seychelles vs Saint Lucia: Electricity Generation, Gigawatt hours

Seychelles
434.32
in 2022
Saint Lucia
409.4
in 2022
Seychelles rank
159th
Saint Lucia rank
161st

Electricity Generation, Gigawatt hours over time

  • Seychelles
  • Saint Lucia
0100200300400200020112022

How they compare

Seychelles currently reports 434.32 against 409.4 in Saint Lucia, a difference of 24.92.

That makes Seychelles's figure about 1.1 times Saint Lucia's.

The two have swapped places 1 time across 23 shared years of data; in 2000 it was Saint Lucia ahead.

Seychelles ranks 159th and Saint Lucia ranks 161st of 224 countries.

Across the 3 decades both report, Seychelles averaged higher in 1 and Saint Lucia in 2.

Head to head by decade

Decade Seychelles Saint Lucia Difference Ahead
2000s 234.38 317.18 82.8 Saint Lucia
2010s 371.96 389.21 17.25 Saint Lucia
2020s 429.52 390.41 39.11 Seychelles

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Seychelles or Saint Lucia?
Seychelles, at 434.32 against 409.4 in Saint Lucia as of 2022.
What is the difference in electricity generation, gigawatt hours between Seychelles and Saint Lucia?
24.92, with Seychelles ahead.
How many years of comparable data are there for Seychelles and Saint Lucia?
23 years are reported by both, from 2000 to 2022.
How do Seychelles and Saint Lucia rank globally for electricity generation, gigawatt hours?
Seychelles ranks 159th and Saint Lucia ranks 161st of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Seychelles vs Saint Lucia: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 05 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/seychelles/st-lucia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/seychelles/st-lucia/">Seychelles vs Saint Lucia: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.