Sint Maarten (Dutch part) vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours

Sint Maarten (Dutch part)
291
in 2022
Turks and Caicos Islands
261
in 2022
Sint Maarten (Dutch part) rank
169th
Turks and Caicos Islands rank
172nd

Electricity Generation, Gigawatt hours over time

  • Sint Maarten (Dutch part)
  • Turks and Caicos Islands
100200300400200020112022

How they compare

Sint Maarten (Dutch part) currently reports 291 against 261 in Turks and Caicos Islands, a difference of 30.

That makes Sint Maarten (Dutch part)'s figure about 1.1 times Turks and Caicos Islands's.

Across all 11 years both countries report, Sint Maarten (Dutch part) has been ahead every year.

Sint Maarten (Dutch part) ranks 169th and Turks and Caicos Islands ranks 172nd of 224 countries.

Sint Maarten (Dutch part) has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sint Maarten (Dutch part) Turks and Caicos Islands Difference Ahead
2010s 333 241.38 91.62 Sint Maarten (Dutch part)
2020s 280.67 259.67 21 Sint Maarten (Dutch part)

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation, gigawatt hours, Sint Maarten (Dutch part) or Turks and Caicos Islands?
Sint Maarten (Dutch part), at 291 against 261 in Turks and Caicos Islands as of 2022.
What is the difference in electricity generation, gigawatt hours between Sint Maarten (Dutch part) and Turks and Caicos Islands?
30, with Sint Maarten (Dutch part) ahead.
How many years of comparable data are there for Sint Maarten (Dutch part) and Turks and Caicos Islands?
11 years are reported by both, from 2012 to 2022.
How do Sint Maarten (Dutch part) and Turks and Caicos Islands rank globally for electricity generation, gigawatt hours?
Sint Maarten (Dutch part) ranks 169th and Turks and Caicos Islands ranks 172nd of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Generation, Gigawatt hours (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sint Maarten (Dutch part) vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours. Statizoid, drawing on International Monetary Fund. Retrieved 14 September 2026, from https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/sint-maarten-dutch-part/turks-and-caicos-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-generation-gigawatt-hours-fossil-fuels/sint-maarten-dutch-part/turks-and-caicos-islands/">Sint Maarten (Dutch part) vs Turks and Caicos Islands: Electricity Generation, Gigawatt hours</a> — Statizoid

About this data

Indicator
Electricity Generation, Gigawatt hours (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,616 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.