Antigua and Barbuda vs Sint Maarten (Dutch part): Electricity Installed Capacity, Megawatt

Antigua and Barbuda
103.35
in 2023
Sint Maarten (Dutch part)
99
in 2023
Antigua and Barbuda rank
173rd
Sint Maarten (Dutch part) rank
176th

Electricity Installed Capacity, Megawatt over time

  • Antigua and Barbuda
  • Sint Maarten (Dutch part)
20406080100120200020112023

How they compare

Antigua and Barbuda currently reports 103.35 against 99 in Sint Maarten (Dutch part), a difference of 4.35.

The two have swapped places 3 times across 12 shared years of data; in 2012 it was Sint Maarten (Dutch part) ahead.

Antigua and Barbuda ranks 173rd and Sint Maarten (Dutch part) ranks 176th of 224 countries.

Sint Maarten (Dutch part) has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Antigua and Barbuda Sint Maarten (Dutch part) Difference Ahead
2010s 94.61 95.25 0.6375 Sint Maarten (Dutch part)
2020s 75.86 99 23.14 Sint Maarten (Dutch part)

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity installed capacity, megawatt, Antigua and Barbuda or Sint Maarten (Dutch part)?
Antigua and Barbuda, at 103.35 against 99 in Sint Maarten (Dutch part) as of 2023.
What is the difference in electricity installed capacity, megawatt between Antigua and Barbuda and Sint Maarten (Dutch part)?
4.35, with Antigua and Barbuda ahead.
How many years of comparable data are there for Antigua and Barbuda and Sint Maarten (Dutch part)?
12 years are reported by both, from 2012 to 2023.
How do Antigua and Barbuda and Sint Maarten (Dutch part) rank globally for electricity installed capacity, megawatt?
Antigua and Barbuda ranks 173rd and Sint Maarten (Dutch part) ranks 176th of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Installed Capacity, Megawatt (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Antigua and Barbuda vs Sint Maarten (Dutch part): Electricity Installed Capacity, Megawatt. Statizoid, drawing on International Monetary Fund. Retrieved 13 September 2026, from https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/antigua-and-barbuda/sint-maarten-dutch-part/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/antigua-and-barbuda/sint-maarten-dutch-part/">Antigua and Barbuda vs Sint Maarten (Dutch part): Electricity Installed Capacity, Megawatt</a> — Statizoid

About this data

Indicator
Electricity Installed Capacity, Megawatt (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,868 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.