British Virgin Islands vs Grenada: Electricity Installed Capacity, Megawatt

British Virgin Islands
63.04
in 2023
Grenada
56
in 2023
British Virgin Islands rank
188th
Grenada rank
190th

Electricity Installed Capacity, Megawatt over time

  • British Virgin Islands
  • Grenada
0204060200020112023

How they compare

British Virgin Islands currently reports 63.04 against 56 in Grenada, a difference of 7.04.

That makes British Virgin Islands's figure about 1.1 times Grenada's.

The two have swapped places 1 time across 24 shared years of data; in 2000 it was Grenada ahead.

British Virgin Islands ranks 188th and Grenada ranks 190th of 224 countries.

Across the 3 decades both report, British Virgin Islands averaged higher in 1 and Grenada in 2.

Head to head by decade

Decade British Virgin Islands Grenada Difference Ahead
2000s 44.36 51.21 6.85 Grenada
2010s 52.38 52.7 0.3155 Grenada
2020s 63.03 55.08 7.96 British Virgin Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity installed capacity, megawatt, British Virgin Islands or Grenada?
British Virgin Islands, at 63.04 against 56 in Grenada as of 2023.
What is the difference in electricity installed capacity, megawatt between British Virgin Islands and Grenada?
7.04, with British Virgin Islands ahead.
How many years of comparable data are there for British Virgin Islands and Grenada?
24 years are reported by both, from 2000 to 2023.
How do British Virgin Islands and Grenada rank globally for electricity installed capacity, megawatt?
British Virgin Islands ranks 188th and Grenada ranks 190th of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Installed Capacity, Megawatt (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

British Virgin Islands vs Grenada: Electricity Installed Capacity, Megawatt. Statizoid, drawing on International Monetary Fund. Retrieved 03 September 2026, from https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/british-virgin-islands/grenada/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/british-virgin-islands/grenada/">British Virgin Islands vs Grenada: Electricity Installed Capacity, Megawatt</a> — Statizoid

About this data

Indicator
Electricity Installed Capacity, Megawatt (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,868 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.