Guadeloupe vs Timor-Leste: Electricity Installed Capacity, Megawatt

Guadeloupe
347.95
in 2023
Timor-Leste
345.67
in 2023
Guadeloupe rank
143rd
Timor-Leste rank
144th

Electricity Installed Capacity, Megawatt over time

  • Guadeloupe
  • Timor-Leste
0100200300400200020112023

How they compare

Guadeloupe currently reports 347.95 against 345.67 in Timor-Leste, a difference of 2.28.

Across all 24 years both countries report, Guadeloupe has been ahead every year.

Guadeloupe ranks 143rd and Timor-Leste ranks 144th of 224 countries.

Guadeloupe has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Guadeloupe Timor-Leste Difference Ahead
2000s 315.75 38.54 277.21 Guadeloupe
2010s 378.57 277.25 101.32 Guadeloupe
2020s 347.95 345.67 2.28 Guadeloupe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity installed capacity, megawatt, Guadeloupe or Timor-Leste?
Guadeloupe, at 347.95 against 345.67 in Timor-Leste as of 2023.
What is the difference in electricity installed capacity, megawatt between Guadeloupe and Timor-Leste?
2.28, with Guadeloupe ahead.
How many years of comparable data are there for Guadeloupe and Timor-Leste?
24 years are reported by both, from 2000 to 2023.
How do Guadeloupe and Timor-Leste rank globally for electricity installed capacity, megawatt?
Guadeloupe ranks 143rd and Timor-Leste ranks 144th of 224 countries.
Where does this data come from?
International Monetary Fund, published as Electricity Installed Capacity, Megawatt (Fossil fuels). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guadeloupe vs Timor-Leste: Electricity Installed Capacity, Megawatt. Statizoid, drawing on International Monetary Fund. Retrieved 07 September 2026, from https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/guadeloupe/timor-leste/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under IMF Terms and Conditions (attribution required); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-installed-capacity-megawatt-fossil-fuels/guadeloupe/timor-leste/">Guadeloupe vs Timor-Leste: Electricity Installed Capacity, Megawatt</a> — Statizoid

About this data

Indicator
Electricity Installed Capacity, Megawatt (Fossil fuels)
Source
International Monetary Fund
Licence
IMF Terms and Conditions (attribution required)
Coverage
247 places, 5,868 data points, 2000–2023
Last refreshed

This dataset provides information on electricity generation and installed capacity, categorized by energy type (renewable and non-renewable) and five technology types (Fossil fuels, Hydropower, Solar energy, Wind energy, and Bioenergy). The data has been sourced from the International Renewable Energy Agency (https://pxweb.irena.org/pxweb/en/IRENASTAT). The indicators on energy transition have been formulated to help users understand the progress in the adoption of renewable energy sources vis-à-vis the increasing energy requirements.