Guadeloupe vs Luxembourg: Electricity production in the United Kingdom

Guadeloupe
0.37 terawatt-hours
in 2023
Luxembourg
0.42 terawatt-hours
in 2025
Guadeloupe rank
66th
Luxembourg rank
64th

Electricity production in the United Kingdom over time

  • Guadeloupe
  • Luxembourg
00.10.20.30.4197720012025

How they compare

Luxembourg currently reports 0.42 terawatt-hours against 0.37 terawatt-hours in Guadeloupe, a difference of 0.05 terawatt-hours.

That makes Luxembourg's figure about 1.1 times Guadeloupe's.

The two have swapped places 5 times across 24 shared years of data; in 2000 it was Guadeloupe ahead.

Guadeloupe ranks 66th and Luxembourg ranks 64th of 214 countries.

Across the 3 decades both report, Guadeloupe averaged higher in 1 and Luxembourg in 2.

Head to head by decade

Decade Guadeloupe Luxembourg Difference Ahead
2000s 0.12 terawatt-hours 0.047 terawatt-hours 0.073 terawatt-hours Guadeloupe
2010s 0.136 terawatt-hours 0.141 terawatt-hours 0.005 terawatt-hours Luxembourg
2020s 0.31 terawatt-hours 0.3825 terawatt-hours 0.0725 terawatt-hours Luxembourg

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity production in the united kingdom, Guadeloupe or Luxembourg?
Luxembourg, at 0.42 terawatt-hours against 0.37 terawatt-hours in Guadeloupe as of 2025.
What is the difference in electricity production in the united kingdom between Guadeloupe and Luxembourg?
0.05 terawatt-hours, with Luxembourg ahead.
How many years of comparable data are there for Guadeloupe and Luxembourg?
24 years are reported by both, from 2000 to 2023.
How do Guadeloupe and Luxembourg rank globally for electricity production in the united kingdom?
Guadeloupe ranks 66th and Luxembourg ranks 64th of 214 countries.
Where does this data come from?
Ember (2026); Energy Institute – Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity production in the United Kingdom. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guadeloupe vs Luxembourg: Electricity production in the United Kingdom. Statizoid, drawing on Ember (2026); Energy Institute – Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data. Retrieved 23 September 2026, from https://energy.statizoid.com/compare/electricity-mix-uk/guadeloupe/luxembourg/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-mix-uk/guadeloupe/luxembourg/">Guadeloupe vs Luxembourg: Electricity production in the United Kingdom</a> — Statizoid

About this data

Indicator
Electricity production in the United Kingdom
Unit
terawatt-hours
Source
Ember (2026); Energy Institute – Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 7,365 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.