Egypt, Arab Rep. vs Lao PDR: Electricity generation by source
Egypt, Arab Rep.
0 terawatt-hours
in 2025
Lao PDR
0 terawatt-hours
in 2024
Egypt, Arab Rep. rank
28th
Lao PDR rank
28th
Electricity generation by source over time
- Egypt, Arab Rep.
- Lao PDR
How they compare
Egypt, Arab Rep. currently reports 0 terawatt-hours against 0 terawatt-hours in Lao PDR, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Lao PDR has been ahead every year.
Egypt, Arab Rep. ranks 28th and Lao PDR ranks 28th of 214 countries.
Head to head by decade
| Decade | Egypt, Arab Rep. | Lao PDR | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation by source, Egypt, Arab Rep. or Lao PDR?
- Egypt, Arab Rep., at 0 terawatt-hours against 0 terawatt-hours in Lao PDR as of 2025.
- What is the difference in electricity generation by source between Egypt, Arab Rep. and Lao PDR?
- 0 terawatt-hours, with Egypt, Arab Rep. ahead.
- How many years of comparable data are there for Egypt, Arab Rep. and Lao PDR?
- 25 years are reported by both, from 2000 to 2024.
- How do Egypt, Arab Rep. and Lao PDR rank globally for electricity generation by source?
- Egypt, Arab Rep. ranks 28th and Lao PDR ranks 28th of 214 countries.
- Where does this data come from?
- Ember (2026); Pinto et al. (2023); Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Electricity generation by source. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.