Lao People’s Democratic Republic vs St. Vincent and the Grenadines: Electricity generation by source

Lao People’s Democratic Republic
0 terawatt-hours
in 2024
St. Vincent and the Grenadines
0 terawatt-hours
in 2024
Lao People’s Democratic Republic rank
28th
St. Vincent and the Grenadines rank
28th

Electricity generation by source over time

  • Lao People’s Democratic Republic
  • St. Vincent and the Grenadines
00.20.40.60.81200020122024

How they compare

Lao People’s Democratic Republic currently reports 0 terawatt-hours against 0 terawatt-hours in St. Vincent and the Grenadines, a difference of 0 terawatt-hours.

Across all 25 years both countries report, St. Vincent and the Grenadines has been ahead every year.

Lao People’s Democratic Republic ranks 28th and St. Vincent and the Grenadines ranks 28th of 210 countries.

Head to head by decade

Decade Lao People’s Democratic Republic St. Vincent and the Grenadines Difference Ahead
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation by source, Lao People’s Democratic Republic or St. Vincent and the Grenadines?
Lao People’s Democratic Republic, at 0 terawatt-hours against 0 terawatt-hours in St. Vincent and the Grenadines as of 2024.
What is the difference in electricity generation by source between Lao People’s Democratic Republic and St. Vincent and the Grenadines?
0 terawatt-hours, with Lao People’s Democratic Republic ahead.
How many years of comparable data are there for Lao People’s Democratic Republic and St. Vincent and the Grenadines?
25 years are reported by both, from 2000 to 2024.
How do Lao People’s Democratic Republic and St. Vincent and the Grenadines rank globally for electricity generation by source?
Lao People’s Democratic Republic ranks 28th and St. Vincent and the Grenadines ranks 28th of 210 countries.
Where does this data come from?
Ember (2026); Pinto et al. (2023); Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Electricity generation by source. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lao People’s Democratic Republic vs St. Vincent and the Grenadines: Electricity generation by source. Statizoid, drawing on Ember (2026); Pinto et al. (2023); Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data. Retrieved 18 August 2026, from https://energy.statizoid.com/compare/electricity-prod-source-stacked/lao-pdr/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-prod-source-stacked/lao-pdr/st-vincent-and-the-grenadines/">Lao People’s Democratic Republic vs St. Vincent and the Grenadines: Electricity generation by source</a> — Statizoid

About this data

Indicator
Electricity generation by source
Unit
terawatt-hours
Source
Ember (2026); Pinto et al. (2023); Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 7,365 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.