Grenada vs Turks and Caicos Islands: Electricity production from renewable sources, excluding hydroelectric

Grenada
4.59 million kWh
in 2021
Turks and Caicos Islands
3.96 million kWh
in 2021
Grenada rank
173rd
Turks and Caicos Islands rank
175th

Electricity production from renewable sources, excluding hydroelectric over time

  • Grenada
  • Turks and Caicos Islands
01.0M2.0M3.0M4.0M5.0M200020102021

How they compare

Grenada currently reports 4.59 million kWh against 3.96 million kWh in Turks and Caicos Islands, a difference of 630,000 kWh.

That makes Grenada's figure about 1.2 times Turks and Caicos Islands's.

The two have swapped places 1 time across 22 shared years of data; in 2000 it was Turks and Caicos Islands ahead.

Grenada ranks 173rd and Turks and Caicos Islands ranks 175th of 210 countries.

Grenada has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Grenada Turks and Caicos Islands Difference Ahead
2000s 73,000 kWh 0 kWh 73,000 kWh Grenada
2010s 1.91 million kWh 256,000 kWh 1.65 million kWh Grenada
2020s 4.53 million kWh 2.71 million kWh 1.81 million kWh Grenada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity production from renewable sources, excluding hydroelectric, Grenada or Turks and Caicos Islands?
Grenada, at 4.59 million kWh against 3.96 million kWh in Turks and Caicos Islands as of 2021.
What is the difference in electricity production from renewable sources, excluding hydroelectric between Grenada and Turks and Caicos Islands?
630,000 kWh, with Grenada ahead.
How many years of comparable data are there for Grenada and Turks and Caicos Islands?
22 years are reported by both, from 2000 to 2021.
How do Grenada and Turks and Caicos Islands rank globally for electricity production from renewable sources, excluding hydroelectric?
Grenada ranks 173rd and Turks and Caicos Islands ranks 175th of 210 countries.
Where does this data come from?
IEA Energy Statistics Data Browser, International Energy Agency (IEA), published as Electricity production from renewable sources, excluding hydroelectric (kWh). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs Turks and Caicos Islands: Electricity production from renewable sources, excluding hydroelectric. Statizoid, drawing on IEA Energy Statistics Data Browser, International Energy Agency (IEA). Retrieved 06 September 2026, from https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh/grenada/turks-and-caicos-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-production-from-renewable-sources-excluding-hydroelectric-kwh/grenada/turks-and-caicos-islands/">Grenada vs Turks and Caicos Islands: Electricity production from renewable sources, excluding hydroelectric</a> — Statizoid

About this data

Indicator
Electricity production from renewable sources, excluding hydroelectric (kWh)
Unit
kWh
Source
IEA Energy Statistics Data Browser, International Energy Agency (IEA)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
257 places, 7,460 data points, 1990–2021
Last refreshed

Electricity production from renewable sources in kilowatt-hour (kWh), excluding hydroelectric, includes geothermal, solar, tides, wind, biomass, and biofuels.