Bosnia and Herzegovina vs Jordan: Electricity generation from renewables

Bosnia and Herzegovina
6.29 terawatt-hours
in 2025
Jordan
5.7 terawatt-hours
in 2024
Bosnia and Herzegovina rank
87th
Jordan rank
90th

Electricity generation from renewables over time

  • Bosnia and Herzegovina
  • Jordan
02468200020122025

How they compare

Bosnia and Herzegovina currently reports 6.29 terawatt-hours against 5.7 terawatt-hours in Jordan, a difference of 0.59 terawatt-hours.

That makes Bosnia and Herzegovina's figure about 1.1 times Jordan's.

Across all 25 years both countries report, Bosnia and Herzegovina has been ahead every year.

Bosnia and Herzegovina ranks 87th and Jordan ranks 90th of 214 countries.

Bosnia and Herzegovina has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Bosnia and Herzegovina Jordan Difference Ahead
2000s 5.3 terawatt-hours 0.057 terawatt-hours 5.24 terawatt-hours Bosnia and Herzegovina
2010s 5.77 terawatt-hours 0.794 terawatt-hours 4.97 terawatt-hours Bosnia and Herzegovina
2020s 6.19 terawatt-hours 4.99 terawatt-hours 1.2 terawatt-hours Bosnia and Herzegovina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from renewables, Bosnia and Herzegovina or Jordan?
Bosnia and Herzegovina, at 6.29 terawatt-hours against 5.7 terawatt-hours in Jordan as of 2025.
What is the difference in electricity generation from renewables between Bosnia and Herzegovina and Jordan?
0.59 terawatt-hours, with Bosnia and Herzegovina ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Jordan?
25 years are reported by both, from 2000 to 2024.
How do Bosnia and Herzegovina and Jordan rank globally for electricity generation from renewables?
Bosnia and Herzegovina ranks 87th and Jordan ranks 90th of 214 countries.
Where does this data come from?
Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from renewables. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Jordan: Electricity generation from renewables. Statizoid, drawing on Ember (2026) and other sources – with major processing by Our World in Data. Retrieved 04 September 2026, from https://energy.statizoid.com/compare/electricity-renewables/bosnia-and-herzegovina/jordan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/electricity-renewables/bosnia-and-herzegovina/jordan/">Bosnia and Herzegovina vs Jordan: Electricity generation from renewables</a> — Statizoid

About this data

Indicator
Electricity generation from renewables
Unit
terawatt-hours
Source
Ember (2026) and other sources – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 7,081 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.