CIS (EI) vs USSR: Hydropower generation by region

CIS (EI)
258.2 terawatt-hours
in 2025
USSR
202.99 terawatt-hours
in 1984
CIS (EI) rank
2nd
USSR rank
3rd

Hydropower generation by region over time

  • CIS (EI)
  • USSR
100150200250196519952025

How they compare

CIS (EI) currently reports 258.2 terawatt-hours against 202.99 terawatt-hours in USSR, a difference of 55.21 terawatt-hours.

That makes CIS (EI)'s figure about 1.3 times USSR's.

Across all 20 years both countries report, USSR has been ahead every year.

CIS (EI) ranks 2nd and USSR ranks 3rd of 3 groups.

Head to head by decade

Decade CIS (EI) USSR Difference Ahead
1960s 96.21 terawatt-hours 96.21 terawatt-hours 0 terawatt-hours
1970s 137.82 terawatt-hours 137.82 terawatt-hours 0 terawatt-hours
1980s 185.74 terawatt-hours 185.74 terawatt-hours 0 terawatt-hours

Averages of every year both report within each decade.

Frequently asked questions

Which has higher hydropower generation by region, CIS (EI) or USSR?
CIS (EI), at 258.2 terawatt-hours against 202.99 terawatt-hours in USSR as of 2025.
What is the difference in hydropower generation by region between CIS (EI) and USSR?
55.21 terawatt-hours, with CIS (EI) ahead.
How many years of comparable data are there for CIS (EI) and USSR?
20 years are reported by both, from 1965 to 1984.
How do CIS (EI) and USSR rank globally for hydropower generation by region?
CIS (EI) ranks 2nd and USSR ranks 3rd of 3 groups.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Hydropower generation by region. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Hydropower generation by region
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,425 data points, 1965–2025
Last refreshed

Figures are based on gross primary hydroelectric generation and do not account for cross-border electricity supply.