Antigua and Barbuda vs Cape Verde: Electricity generation from hydropower
Antigua and Barbuda
0 terawatt-hours
in 2024
Cape Verde
0 terawatt-hours
in 2024
Antigua and Barbuda rank
154th
Cape Verde rank
154th
Electricity generation from hydropower over time
- Antigua and Barbuda
- Cape Verde
How they compare
Antigua and Barbuda currently reports 0 terawatt-hours against 0 terawatt-hours in Cape Verde, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Cape Verde has been ahead every year.
Antigua and Barbuda ranks 154th and Cape Verde ranks 154th of 214 countries.
Head to head by decade
| Decade | Antigua and Barbuda | Cape Verde | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from hydropower, Antigua and Barbuda or Cape Verde?
- Antigua and Barbuda, at 0 terawatt-hours against 0 terawatt-hours in Cape Verde as of 2024.
- What is the difference in electricity generation from hydropower between Antigua and Barbuda and Cape Verde?
- 0 terawatt-hours, with Antigua and Barbuda ahead.
- How many years of comparable data are there for Antigua and Barbuda and Cape Verde?
- 25 years are reported by both, from 2000 to 2024.
- How do Antigua and Barbuda and Cape Verde rank globally for electricity generation from hydropower?
- Antigua and Barbuda ranks 154th and Cape Verde ranks 154th of 214 countries.
- Where does this data come from?
- Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.