Antigua and Barbuda vs South Sudan: Electricity generation from hydropower
Antigua and Barbuda
0 terawatt-hours
in 2024
South Sudan
0 terawatt-hours
in 2024
Antigua and Barbuda rank
155th
South Sudan rank
155th
Electricity generation from hydropower over time
- Antigua and Barbuda
- South Sudan
How they compare
Antigua and Barbuda currently reports 0 terawatt-hours against 0 terawatt-hours in South Sudan, a difference of 0 terawatt-hours.
Across all 13 years both countries report, South Sudan has been ahead every year.
Antigua and Barbuda ranks 155th and South Sudan ranks 155th of 211 countries.
Head to head by decade
| Decade | Antigua and Barbuda | South Sudan | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from hydropower, Antigua and Barbuda or South Sudan?
- Antigua and Barbuda, at 0 terawatt-hours against 0 terawatt-hours in South Sudan as of 2024.
- What is the difference in electricity generation from hydropower between Antigua and Barbuda and South Sudan?
- 0 terawatt-hours, with Antigua and Barbuda ahead.
- How many years of comparable data are there for Antigua and Barbuda and South Sudan?
- 13 years are reported by both, from 2012 to 2024.
- How do Antigua and Barbuda and South Sudan rank globally for electricity generation from hydropower?
- Antigua and Barbuda ranks 155th and South Sudan ranks 155th of 211 countries.
- Where does this data come from?
- Ember (2026) and other sources β with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.