Burundi vs Equatorial Guinea: Electricity generation from hydropower

Burundi
0.36 terawatt-hours
in 2024
Equatorial Guinea
0.4 terawatt-hours
in 2024
Burundi rank
120th
Equatorial Guinea rank
118th

Electricity generation from hydropower over time

  • Burundi
  • Equatorial Guinea
00.10.20.30.40.5200020122024

How they compare

Equatorial Guinea currently reports 0.4 terawatt-hours against 0.36 terawatt-hours in Burundi, a difference of 0.04 terawatt-hours.

That makes Equatorial Guinea's figure about 1.1 times Burundi's.

The two have swapped places 3 times across 25 shared years of data; in 2000 it was Burundi ahead.

Burundi ranks 120th and Equatorial Guinea ranks 118th of 215 countries.

Across the 3 decades both report, Burundi averaged higher in 1 and Equatorial Guinea in 2.

Head to head by decade

Decade Burundi Equatorial Guinea Difference Ahead
2000s 0.106 terawatt-hours 0.018 terawatt-hours 0.088 terawatt-hours Burundi
2010s 0.166 terawatt-hours 0.304 terawatt-hours 0.138 terawatt-hours Equatorial Guinea
2020s 0.304 terawatt-hours 0.438 terawatt-hours 0.134 terawatt-hours Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from hydropower, Burundi or Equatorial Guinea?
Equatorial Guinea, at 0.4 terawatt-hours against 0.36 terawatt-hours in Burundi as of 2024.
What is the difference in electricity generation from hydropower between Burundi and Equatorial Guinea?
0.04 terawatt-hours, with Equatorial Guinea ahead.
How many years of comparable data are there for Burundi and Equatorial Guinea?
25 years are reported by both, from 2000 to 2024.
How do Burundi and Equatorial Guinea rank globally for electricity generation from hydropower?
Burundi ranks 120th and Equatorial Guinea ranks 118th of 215 countries.
Where does this data come from?
Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burundi vs Equatorial Guinea: Electricity generation from hydropower. Statizoid, drawing on Ember (2026) and other sources – with major processing by Our World in Data. Retrieved 23 September 2026, from https://energy.statizoid.com/compare/hydropower-generation/burundi/equatorial-guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/hydropower-generation/burundi/equatorial-guinea/">Burundi vs Equatorial Guinea: Electricity generation from hydropower</a> — Statizoid

About this data

Indicator
Electricity generation from hydropower
Unit
terawatt-hours
Source
Ember (2026) and other sources – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
217 places, 7,927 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.