Gibraltar vs St. Kitts and Nevis: Electricity generation from hydropower
Gibraltar
0 terawatt-hours
in 2024
St. Kitts and Nevis
0 terawatt-hours
in 2024
Gibraltar rank
154th
St. Kitts and Nevis rank
154th
Electricity generation from hydropower over time
- Gibraltar
- St. Kitts and Nevis
How they compare
Gibraltar currently reports 0 terawatt-hours against 0 terawatt-hours in St. Kitts and Nevis, a difference of 0 terawatt-hours.
Across all 25 years both countries report, St. Kitts and Nevis has been ahead every year.
Gibraltar ranks 154th and St. Kitts and Nevis ranks 154th of 214 countries.
Head to head by decade
| Decade | Gibraltar | St. Kitts and Nevis | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from hydropower, Gibraltar or St. Kitts and Nevis?
- Gibraltar, at 0 terawatt-hours against 0 terawatt-hours in St. Kitts and Nevis as of 2024.
- What is the difference in electricity generation from hydropower between Gibraltar and St. Kitts and Nevis?
- 0 terawatt-hours, with Gibraltar ahead.
- How many years of comparable data are there for Gibraltar and St. Kitts and Nevis?
- 25 years are reported by both, from 2000 to 2024.
- How do Gibraltar and St. Kitts and Nevis rank globally for electricity generation from hydropower?
- Gibraltar ranks 154th and St. Kitts and Nevis ranks 154th of 214 countries.
- Where does this data come from?
- Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.