Guadeloupe vs Sao Tome and Principe: Electricity generation from hydropower

Guadeloupe
0.01 terawatt-hours
in 2023
Sao Tome and Principe
0.01 terawatt-hours
in 2023
Guadeloupe rank
150th
Sao Tome and Principe rank
150th

Electricity generation from hydropower over time

  • Guadeloupe
  • Sao Tome and Principe
00.010.020.030.04200020112023

How they compare

Guadeloupe currently reports 0.01 terawatt-hours against 0.01 terawatt-hours in Sao Tome and Principe, a difference of 0 terawatt-hours.

The two have swapped places 4 times across 24 shared years of data; in 2000 it was Sao Tome and Principe ahead.

Guadeloupe ranks 150th and Sao Tome and Principe ranks 150th of 215 countries.

Guadeloupe has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Guadeloupe Sao Tome and Principe Difference Ahead
2000s 0.019 terawatt-hours 0.008 terawatt-hours 0.011 terawatt-hours Guadeloupe
2010s 0.026 terawatt-hours 0.007 terawatt-hours 0.019 terawatt-hours Guadeloupe
2020s 0.015 terawatt-hours 0.01 terawatt-hours 0.005 terawatt-hours Guadeloupe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from hydropower, Guadeloupe or Sao Tome and Principe?
Guadeloupe, at 0.01 terawatt-hours against 0.01 terawatt-hours in Sao Tome and Principe as of 2023.
What is the difference in electricity generation from hydropower between Guadeloupe and Sao Tome and Principe?
0 terawatt-hours, with Guadeloupe ahead.
How many years of comparable data are there for Guadeloupe and Sao Tome and Principe?
24 years are reported by both, from 2000 to 2023.
How do Guadeloupe and Sao Tome and Principe rank globally for electricity generation from hydropower?
Guadeloupe ranks 150th and Sao Tome and Principe ranks 150th of 215 countries.
Where does this data come from?
Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Guadeloupe vs Sao Tome and Principe: Electricity generation from hydropower. Statizoid, drawing on Ember (2026) and other sources – with major processing by Our World in Data. Retrieved 22 August 2026, from https://energy.statizoid.com/compare/hydropower-generation/guadeloupe/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/hydropower-generation/guadeloupe/sao-tome-and-principe/">Guadeloupe vs Sao Tome and Principe: Electricity generation from hydropower</a> — Statizoid

About this data

Indicator
Electricity generation from hydropower
Unit
terawatt-hours
Source
Ember (2026) and other sources – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
217 places, 7,927 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.