Montenegro vs Poland: Electricity generation from hydropower
Montenegro
1.44 terawatt-hours
in 2025
Poland
1.7 terawatt-hours
in 2025
Montenegro rank
95th
Poland rank
92nd
Electricity generation from hydropower over time
- Montenegro
- Poland
How they compare
Poland currently reports 1.7 terawatt-hours against 1.44 terawatt-hours in Montenegro, a difference of 0.26 terawatt-hours.
That makes Poland's figure about 1.2 times Montenegro's.
The two have swapped places 4 times across 21 shared years of data; in 2005 it was Poland ahead.
Montenegro ranks 95th and Poland ranks 92nd of 215 countries.
Poland has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Montenegro | Poland | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 1.7 terawatt-hours | 2.22 terawatt-hours | 0.522 terawatt-hours | Poland |
| 2010s | 1.78 terawatt-hours | 2.24 terawatt-hours | 0.46 terawatt-hours | Poland |
| 2020s | 1.72 terawatt-hours | 2.11 terawatt-hours | 0.3867 terawatt-hours | Poland |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from hydropower, Montenegro or Poland?
- Poland, at 1.7 terawatt-hours against 1.44 terawatt-hours in Montenegro as of 2025.
- What is the difference in electricity generation from hydropower between Montenegro and Poland?
- 0.26 terawatt-hours, with Poland ahead.
- How many years of comparable data are there for Montenegro and Poland?
- 21 years are reported by both, from 2005 to 2025.
- How do Montenegro and Poland rank globally for electricity generation from hydropower?
- Montenegro ranks 95th and Poland ranks 92nd of 215 countries.
- Where does this data come from?
- Ember (2026) and other sources β with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.