Montserrat vs Saint Lucia: Electricity generation from hydropower
Montserrat
0 terawatt-hours
in 2024
Saint Lucia
0 terawatt-hours
in 2024
Montserrat rank
154th
Saint Lucia rank
154th
Electricity generation from hydropower over time
- Montserrat
- Saint Lucia
How they compare
Montserrat currently reports 0 terawatt-hours against 0 terawatt-hours in Saint Lucia, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Saint Lucia has been ahead every year.
Montserrat ranks 154th and Saint Lucia ranks 154th of 214 countries.
Head to head by decade
| Decade | Montserrat | Saint Lucia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from hydropower, Montserrat or Saint Lucia?
- Montserrat, at 0 terawatt-hours against 0 terawatt-hours in Saint Lucia as of 2024.
- What is the difference in electricity generation from hydropower between Montserrat and Saint Lucia?
- 0 terawatt-hours, with Montserrat ahead.
- How many years of comparable data are there for Montserrat and Saint Lucia?
- 25 years are reported by both, from 2000 to 2024.
- How do Montserrat and Saint Lucia rank globally for electricity generation from hydropower?
- Montserrat ranks 154th and Saint Lucia ranks 154th of 214 countries.
- Where does this data come from?
- Ember (2026) and other sources – with major processing by Our World in Data, published as Electricity generation from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.