Belize vs Saint Vincent and the Grenadines: Installed solar pv capacity
Belize
0.007
in 2025
Saint Vincent and the Grenadines
0.0056
in 2025
Belize rank
186th
Saint Vincent and the Grenadines rank
189th
Installed solar pv capacity over time
- Belize
- Saint Vincent and the Grenadines
How they compare
Belize currently reports 0.007 against 0.0056 in Saint Vincent and the Grenadines, a difference of 0.0014.
That makes Belize's figure about 1.2 times Saint Vincent and the Grenadines's.
The two have swapped places 3 times across 15 shared years of data; in 2011 it was Saint Vincent and the Grenadines ahead.
Belize ranks 186th and Saint Vincent and the Grenadines ranks 189th of 218 countries.
Across the 2 decades both report, Belize averaged higher in 1 and Saint Vincent and the Grenadines in 1.
Head to head by decade
| Decade | Belize | Saint Vincent and the Grenadines | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0.0013 | 0.0018 | 0.0005 | Saint Vincent and the Grenadines |
| 2020s | 0.0069 | 0.0049 | 0.002 | Belize |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher installed solar pv capacity, Belize or Saint Vincent and the Grenadines?
- Belize, at 0.007 against 0.0056 in Saint Vincent and the Grenadines as of 2025.
- What is the difference in installed solar pv capacity between Belize and Saint Vincent and the Grenadines?
- 0.0014, with Belize ahead.
- How many years of comparable data are there for Belize and Saint Vincent and the Grenadines?
- 15 years are reported by both, from 2011 to 2025.
- How do Belize and Saint Vincent and the Grenadines rank globally for installed solar pv capacity?
- Belize ranks 186th and Saint Vincent and the Grenadines ranks 189th of 218 countries.
- Where does this data come from?
- Our World in Data, published as Installed solar pv capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.