Guam vs Montenegro: Installed solar energy capacity
Guam
0.1048 gigawatts
in 2025
Montenegro
0.0997 gigawatts
in 2025
Guam rank
125th
Montenegro rank
128th
Installed solar energy capacity over time
- Guam
- Montenegro
How they compare
Guam currently reports 0.1048 gigawatts against 0.0997 gigawatts in Montenegro, a difference of 0.0051 gigawatts.
That makes Guam's figure about 1.1 times Montenegro's.
Across all 6 years both countries report, Guam has been ahead every year.
Guam ranks 125th and Montenegro ranks 128th of 218 countries.
Guam has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher installed solar energy capacity, Guam or Montenegro?
- Guam, at 0.1048 gigawatts against 0.0997 gigawatts in Montenegro as of 2025.
- What is the difference in installed solar energy capacity between Guam and Montenegro?
- 0.0051 gigawatts, with Guam ahead.
- How many years of comparable data are there for Guam and Montenegro?
- 6 years are reported by both, from 2020 to 2025.
- How do Guam and Montenegro rank globally for installed solar energy capacity?
- Guam ranks 125th and Montenegro ranks 128th of 218 countries.
- Where does this data come from?
- IRENA (2026) β processed by Our World in Data, published as Installed solar energy capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Total solar (on- and off-grid) electricity installed capacity, measured in gigawatts. This includes solar photovoltaic and concentrated solar power.