Ecuador vs Moldova: Renewable electricity generation by source
Ecuador
0.19 terawatt-hours
in 2025
Moldova
0.16 terawatt-hours
in 2025
Ecuador rank
82nd
Moldova rank
83rd
Renewable electricity generation by source over time
- Ecuador
- Moldova
How they compare
Ecuador currently reports 0.19 terawatt-hours against 0.16 terawatt-hours in Moldova, a difference of 0.03 terawatt-hours.
That makes Ecuador's figure about 1.2 times Moldova's.
The two have swapped places 3 times across 26 shared years of data; in 2000 it was Moldova ahead.
Ecuador ranks 82nd and Moldova ranks 83rd of 212 countries.
Ecuador has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Ecuador | Moldova | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0.056 terawatt-hours | 0.007 terawatt-hours | 0.049 terawatt-hours | Ecuador |
| 2020s | 0.1383 terawatt-hours | 0.1383 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher renewable electricity generation by source, Ecuador or Moldova?
- Ecuador, at 0.19 terawatt-hours against 0.16 terawatt-hours in Moldova as of 2025.
- What is the difference in renewable electricity generation by source between Ecuador and Moldova?
- 0.03 terawatt-hours, with Ecuador ahead.
- How many years of comparable data are there for Ecuador and Moldova?
- 26 years are reported by both, from 2000 to 2025.
- How do Ecuador and Moldova rank globally for renewable electricity generation by source?
- Ecuador ranks 82nd and Moldova ranks 83rd of 212 countries.
- Where does this data come from?
- Ember (2026); Energy Institute – Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Renewable electricity generation by source. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.