Liberia vs Malta: Renewable electricity generation by source
Liberia
0 terawatt-hours
in 2024
Malta
0 terawatt-hours
in 2025
Liberia rank
111th
Malta rank
111th
Renewable electricity generation by source over time
- Liberia
- Malta
How they compare
Liberia currently reports 0 terawatt-hours against 0 terawatt-hours in Malta, a difference of 0 terawatt-hours.
Across all 13 years both countries report, Malta has been ahead every year.
Liberia ranks 111th and Malta ranks 111th of 212 countries.
Head to head by decade
| Decade | Liberia | Malta | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher renewable electricity generation by source, Liberia or Malta?
- Liberia, at 0 terawatt-hours against 0 terawatt-hours in Malta as of 2024.
- What is the difference in renewable electricity generation by source between Liberia and Malta?
- 0 terawatt-hours, with Liberia ahead.
- How many years of comparable data are there for Liberia and Malta?
- 13 years are reported by both, from 2012 to 2024.
- How do Liberia and Malta rank globally for renewable electricity generation by source?
- Liberia ranks 111th and Malta ranks 111th of 212 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Renewable electricity generation by source. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.