Congo vs Curacao: Primary energy from solar and wind

Congo
0 terawatt-hours
in 2025
Curacao
0 terawatt-hours
in 2025
Congo rank
80th
Curacao rank
80th

Primary energy from solar and wind over time

  • Congo
  • Curacao
00.20.40.60.81196519952025

How they compare

Congo currently reports 0 terawatt-hours against 0 terawatt-hours in Curacao, a difference of 0 terawatt-hours.

Across all 14 years both countries report, Curacao has been ahead every year.

Congo ranks 80th and Curacao ranks 80th of 110 countries.

Head to head by decade

Decade Congo Curacao Difference Ahead
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours

Averages of every year both report within each decade.

Frequently asked questions

Which has higher primary energy from solar and wind, Congo or Curacao?
Congo, at 0 terawatt-hours against 0 terawatt-hours in Curacao as of 2025.
What is the difference in primary energy from solar and wind between Congo and Curacao?
0 terawatt-hours, with Congo ahead.
How many years of comparable data are there for Congo and Curacao?
14 years are reported by both, from 2012 to 2025.
How do Congo and Curacao rank globally for primary energy from solar and wind?
Congo ranks 80th and Curacao ranks 80th of 110 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Primary energy from solar and wind. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Primary energy from solar and wind
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
114 places, 6,401 data points, 1965–2025
Last refreshed

Measured in terawatt-hours of total energy supply.