Austria vs Peru: Primary energy from hydropower

Austria
36.8 terawatt-hours
in 2025
Peru
34 terawatt-hours
in 2025
Austria rank
18th
Peru rank
20th

Primary energy from hydropower over time

  • Austria
  • Peru
01020304050196519952025

How they compare

Austria currently reports 36.8 terawatt-hours against 34 terawatt-hours in Peru, a difference of 2.8 terawatt-hours.

That makes Austria's figure about 1.1 times Peru's.

Across all 61 years both countries report, Austria has been ahead every year.

Austria ranks 18th and Peru ranks 20th of 80 countries.

Austria has averaged higher in every one of the 7 decades both report.

Head to head by decade

Decade Austria Peru Difference Ahead
1960s 17.2 terawatt-hours 3.14 terawatt-hours 14.06 terawatt-hours Austria
1970s 21.96 terawatt-hours 5.24 terawatt-hours 16.72 terawatt-hours Austria
1980s 31.58 terawatt-hours 9.15 terawatt-hours 22.43 terawatt-hours Austria
1990s 35.55 terawatt-hours 12.4 terawatt-hours 23.14 terawatt-hours Austria
2000s 38.15 terawatt-hours 18.4 terawatt-hours 19.76 terawatt-hours Austria
2010s 39.34 terawatt-hours 24.73 terawatt-hours 14.61 terawatt-hours Austria
2020s 39.78 terawatt-hours 31.22 terawatt-hours 8.57 terawatt-hours Austria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher primary energy from hydropower, Austria or Peru?
Austria, at 36.8 terawatt-hours against 34 terawatt-hours in Peru as of 2025.
What is the difference in primary energy from hydropower between Austria and Peru?
2.8 terawatt-hours, with Austria ahead.
How many years of comparable data are there for Austria and Peru?
61 years are reported by both, from 1965 to 2025.
How do Austria and Peru rank globally for primary energy from hydropower?
Austria ranks 18th and Peru ranks 20th of 80 countries.
Where does this data come from?
Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Primary energy from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Austria vs Peru: Primary energy from hydropower. Statizoid, drawing on Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 23 September 2026, from https://energy.statizoid.com/compare/primary-energy-hydro/austria/peru/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/primary-energy-hydro/austria/peru/">Austria vs Peru: Primary energy from hydropower</a> — Statizoid

About this data

Indicator
Primary energy from hydropower
Unit
terawatt-hours
Source
Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,686 data points, 1965–2025
Last refreshed

Measured in terawatt-hours of total energy supply.