Canada vs USSR: Primary energy from hydropower

Canada
348.47 terawatt-hours
in 2025
USSR
202.99 terawatt-hours
in 1984
Canada rank
3rd
USSR rank
3rd

Primary energy from hydropower over time

  • Canada
  • USSR
100200300400196519952025

How they compare

Canada currently reports 348.47 terawatt-hours against 202.99 terawatt-hours in USSR, a difference of 145.49 terawatt-hours.

That makes Canada's figure about 1.7 times USSR's.

The two have swapped places 2 times across 20 shared years of data; in 1965 it was Canada ahead.

Canada ranks 3rd and USSR ranks 3rd of 77 countries.

Individual pages

About this data

Indicator
Primary energy from hydropower
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,686 data points, 1965–2025
Last refreshed

Measured in terawatt-hours of total energy supply.