North Macedonia vs South Africa: Primary energy from hydropower
North Macedonia
1.27 terawatt-hours
in 2025
South Africa
1.79 terawatt-hours
in 2025
North Macedonia rank
57th
South Africa rank
54th
Primary energy from hydropower over time
- North Macedonia
- South Africa
How they compare
South Africa currently reports 1.79 terawatt-hours against 1.27 terawatt-hours in North Macedonia, a difference of 0.52 terawatt-hours.
That makes South Africa's figure about 1.4 times North Macedonia's.
The two have swapped places 16 times across 36 shared years of data; in 1990 it was South Africa ahead.
North Macedonia ranks 57th and South Africa ranks 54th of 80 countries.
Across the 4 decades both report, North Macedonia averaged higher in 1 and South Africa in 3.
Head to head by decade
| Decade | North Macedonia | South Africa | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 0.8427 terawatt-hours | 1.12 terawatt-hours | 0.2796 terawatt-hours | South Africa |
| 2000s | 1.17 terawatt-hours | 1.65 terawatt-hours | 0.4819 terawatt-hours | South Africa |
| 2010s | 1.55 terawatt-hours | 1.2 terawatt-hours | 0.3512 terawatt-hours | North Macedonia |
| 2020s | 1.39 terawatt-hours | 1.72 terawatt-hours | 0.3346 terawatt-hours | South Africa |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher primary energy from hydropower, North Macedonia or South Africa?
- South Africa, at 1.79 terawatt-hours against 1.27 terawatt-hours in North Macedonia as of 2025.
- What is the difference in primary energy from hydropower between North Macedonia and South Africa?
- 0.52 terawatt-hours, with South Africa ahead.
- How many years of comparable data are there for North Macedonia and South Africa?
- 36 years are reported by both, from 1990 to 2025.
- How do North Macedonia and South Africa rank globally for primary energy from hydropower?
- North Macedonia ranks 57th and South Africa ranks 54th of 80 countries.
- Where does this data come from?
- Energy Institute - Statistical Review of World Energy (2026); Smil (2017) β with major processing by Our World in Data, published as Primary energy from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours of total energy supply.