Cambodia vs Syria: Primary energy from nuclear
Cambodia
0 terawatt-hours
in 2024
Syria
0 terawatt-hours
in 2025
Cambodia rank
33rd
Syria rank
33rd
Primary energy from nuclear over time
- Cambodia
- Syria
How they compare
Cambodia currently reports 0 terawatt-hours against 0 terawatt-hours in Syria, a difference of 0 terawatt-hours.
Across all 45 years both countries report, Syria has been ahead every year.
Cambodia ranks 33rd and Syria ranks 33rd of 215 countries.
Head to head by decade
| Decade | Cambodia | Syria | Difference | Ahead |
|---|---|---|---|---|
| 1980s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 1990s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher primary energy from nuclear, Cambodia or Syria?
- Cambodia, at 0 terawatt-hours against 0 terawatt-hours in Syria as of 2024.
- What is the difference in primary energy from nuclear between Cambodia and Syria?
- 0 terawatt-hours, with Cambodia ahead.
- How many years of comparable data are there for Cambodia and Syria?
- 45 years are reported by both, from 1980 to 2024.
- How do Cambodia and Syria rank globally for primary energy from nuclear?
- Cambodia ranks 33rd and Syria ranks 33rd of 215 countries.
- Where does this data come from?
- Energy Institute - Statistical Review of World Energy (2026); Smil (2017) β with major processing by Our World in Data, published as Primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours of total energy supply.