Canada vs Spain: Primary energy from nuclear

Canada
257.05 terawatt-hours
in 2025
Spain
164.3 terawatt-hours
in 2025
Canada rank
8th
Spain rank
9th

Primary energy from nuclear over time

  • Canada
  • Spain
0100200300196519952025

How they compare

Canada currently reports 257.05 terawatt-hours against 164.3 terawatt-hours in Spain, a difference of 92.75 terawatt-hours.

That makes Canada's figure about 1.6 times Spain's.

The two have swapped places 2 times across 61 shared years of data; in 1965 it was Canada ahead.

Canada ranks 8th and Spain ranks 9th of 219 countries.

Canada has averaged higher in every one of the 7 decades both report.

Head to head by decade

Decade Canada Spain Difference Ahead
1960s 1.15 terawatt-hours 0.5527 terawatt-hours 0.5988 terawatt-hours Canada
1970s 50.08 terawatt-hours 17.56 terawatt-hours 32.52 terawatt-hours Canada
1980s 178.33 terawatt-hours 82.01 terawatt-hours 96.32 terawatt-hours Canada
1990s 258.3 terawatt-hours 170.28 terawatt-hours 88.02 terawatt-hours Canada
2000s 258.76 terawatt-hours 181.49 terawatt-hours 77.27 terawatt-hours Canada
2010s 299.81 terawatt-hours 176.65 terawatt-hours 123.16 terawatt-hours Canada
2020s 269.89 terawatt-hours 171.24 terawatt-hours 98.65 terawatt-hours Canada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher primary energy from nuclear, Canada or Spain?
Canada, at 257.05 terawatt-hours against 164.3 terawatt-hours in Spain as of 2025.
What is the difference in primary energy from nuclear between Canada and Spain?
92.75 terawatt-hours, with Canada ahead.
How many years of comparable data are there for Canada and Spain?
61 years are reported by both, from 1965 to 2025.
How do Canada and Spain rank globally for primary energy from nuclear?
Canada ranks 8th and Spain ranks 9th of 219 countries.
Where does this data come from?
Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Canada vs Spain: Primary energy from nuclear. Statizoid, drawing on Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 22 September 2026, from https://energy.statizoid.com/compare/primary-energy-nuclear/canada/spain/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/primary-energy-nuclear/canada/spain/">Canada vs Spain: Primary energy from nuclear</a> — Statizoid

About this data

Indicator
Primary energy from nuclear
Unit
terawatt-hours
Source
Energy Institute – Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
221 places, 10,754 data points, 1965–2025
Last refreshed

Measured in terawatt-hours of total energy supply.