Lithuania vs Saint Pierre and Miquelon: Primary energy from nuclear

Lithuania
0 terawatt-hours
in 2025
Saint Pierre and Miquelon
0 terawatt-hours
in 2024
Lithuania rank
33rd
Saint Pierre and Miquelon rank
33rd

Primary energy from nuclear over time

  • Lithuania
  • Saint Pierre and Miquelon
0204060198020022025

How they compare

Lithuania currently reports 0 terawatt-hours against 0 terawatt-hours in Saint Pierre and Miquelon, a difference of 0 terawatt-hours.

The two have swapped places 1 time across 40 shared years of data; in 1985 it was Lithuania ahead.

Lithuania ranks 33rd and Saint Pierre and Miquelon ranks 33rd of 215 countries.

Lithuania has averaged higher in every one of the 5 decades both report.

Head to head by decade

Decade Lithuania Saint Pierre and Miquelon Difference Ahead
1980s 35.16 terawatt-hours 0 terawatt-hours 35.16 terawatt-hours Lithuania
1990s 39.35 terawatt-hours 0 terawatt-hours 39.35 terawatt-hours Lithuania
2000s 34.57 terawatt-hours 0 terawatt-hours 34.57 terawatt-hours Lithuania
2010s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2020s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”

Averages of every year both report within each decade.

Frequently asked questions

Which has higher primary energy from nuclear, Lithuania or Saint Pierre and Miquelon?
Lithuania, at 0 terawatt-hours against 0 terawatt-hours in Saint Pierre and Miquelon as of 2025.
What is the difference in primary energy from nuclear between Lithuania and Saint Pierre and Miquelon?
0 terawatt-hours, with Lithuania ahead.
How many years of comparable data are there for Lithuania and Saint Pierre and Miquelon?
40 years are reported by both, from 1985 to 2024.
How do Lithuania and Saint Pierre and Miquelon rank globally for primary energy from nuclear?
Lithuania ranks 33rd and Saint Pierre and Miquelon ranks 33rd of 215 countries.
Where does this data come from?
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data, published as Primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Lithuania vs Saint Pierre and Miquelon: Primary energy from nuclear. Statizoid, drawing on Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data. Retrieved 20 August 2026, from https://energy.statizoid.com/compare/primary-energy-nuclear/lithuania/saint-pierre-and-miquelon/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/primary-energy-nuclear/lithuania/saint-pierre-and-miquelon/">Lithuania vs Saint Pierre and Miquelon: Primary energy from nuclear</a> β€” Statizoid

About this data

Indicator
Primary energy from nuclear
Unit
terawatt-hours
Source
Energy Institute - Statistical Review of World Energy (2026); Smil (2017) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
221 places, 10,754 data points, 1965–2025
Last refreshed

Measured in terawatt-hours of total energy supply.