Montenegro vs Saudi Arabia: Primary energy from nuclear
Montenegro
0 terawatt-hours
in 2024
Saudi Arabia
0 terawatt-hours
in 2025
Montenegro rank
33rd
Saudi Arabia rank
33rd
Primary energy from nuclear over time
- Montenegro
- Saudi Arabia
How they compare
Montenegro currently reports 0 terawatt-hours against 0 terawatt-hours in Saudi Arabia, a difference of 0 terawatt-hours.
Across all 19 years both countries report, Saudi Arabia has been ahead every year.
Montenegro ranks 33rd and Saudi Arabia ranks 33rd of 215 countries.
Head to head by decade
| Decade | Montenegro | Saudi Arabia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | β |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher primary energy from nuclear, Montenegro or Saudi Arabia?
- Montenegro, at 0 terawatt-hours against 0 terawatt-hours in Saudi Arabia as of 2024.
- What is the difference in primary energy from nuclear between Montenegro and Saudi Arabia?
- 0 terawatt-hours, with Montenegro ahead.
- How many years of comparable data are there for Montenegro and Saudi Arabia?
- 19 years are reported by both, from 2006 to 2024.
- How do Montenegro and Saudi Arabia rank globally for primary energy from nuclear?
- Montenegro ranks 33rd and Saudi Arabia ranks 33rd of 215 countries.
- Where does this data come from?
- Energy Institute - Statistical Review of World Energy (2026); Smil (2017) β with major processing by Our World in Data, published as Primary energy from nuclear. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours of total energy supply.