Grenada vs Montserrat: Electricity generation from solar and wind
Grenada
0 terawatt-hours
in 2024
Montserrat
0 terawatt-hours
in 2024
Grenada rank
182nd
Montserrat rank
182nd
Electricity generation from solar and wind over time
- Grenada
- Montserrat
How they compare
Grenada currently reports 0 terawatt-hours against 0 terawatt-hours in Montserrat, a difference of 0 terawatt-hours.
Across all 25 years both countries report, Montserrat has been ahead every year.
Grenada ranks 182nd and Montserrat ranks 182nd of 212 countries.
Head to head by decade
| Decade | Grenada | Montserrat | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar and wind, Grenada or Montserrat?
- Grenada, at 0 terawatt-hours against 0 terawatt-hours in Montserrat as of 2024.
- What is the difference in electricity generation from solar and wind between Grenada and Montserrat?
- 0 terawatt-hours, with Grenada ahead.
- How many years of comparable data are there for Grenada and Montserrat?
- 25 years are reported by both, from 2000 to 2024.
- How do Grenada and Montserrat rank globally for electricity generation from solar and wind?
- Grenada ranks 182nd and Montserrat ranks 182nd of 212 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar and wind. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.