Grenada vs Saint Helena: Electricity generation from solar and wind
Grenada
0 terawatt-hours
in 2024
Saint Helena
0 terawatt-hours
in 2023
Grenada rank
182nd
Saint Helena rank
182nd
Electricity generation from solar and wind over time
- Grenada
- Saint Helena
How they compare
Grenada currently reports 0 terawatt-hours against 0 terawatt-hours in Saint Helena, a difference of 0 terawatt-hours.
Across all 24 years both countries report, Saint Helena has been ahead every year.
Grenada ranks 182nd and Saint Helena ranks 182nd of 212 countries.
Head to head by decade
| Decade | Grenada | Saint Helena | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2010s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
| 2020s | 0 terawatt-hours | 0 terawatt-hours | 0 terawatt-hours | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher electricity generation from solar and wind, Grenada or Saint Helena?
- Grenada, at 0 terawatt-hours against 0 terawatt-hours in Saint Helena as of 2024.
- What is the difference in electricity generation from solar and wind between Grenada and Saint Helena?
- 0 terawatt-hours, with Grenada ahead.
- How many years of comparable data are there for Grenada and Saint Helena?
- 24 years are reported by both, from 2000 to 2023.
- How do Grenada and Saint Helena rank globally for electricity generation from solar and wind?
- Grenada ranks 182nd and Saint Helena ranks 182nd of 212 countries.
- Where does this data come from?
- Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar and wind. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Measured in terawatt-hours.