Montenegro vs Palestine: Electricity generation from solar and wind

Montenegro
0.42 terawatt-hours
in 2025
Palestine
0.39 terawatt-hours
in 2024
Montenegro rank
97th
Palestine rank
98th

Electricity generation from solar and wind over time

  • Montenegro
  • Palestine
00.10.20.30.4200020122025

How they compare

Montenegro currently reports 0.42 terawatt-hours against 0.39 terawatt-hours in Palestine, a difference of 0.03 terawatt-hours.

That makes Montenegro's figure about 1.1 times Palestine's.

The two have swapped places 1 time across 8 shared years of data; in 2017 it was Montenegro ahead.

Montenegro ranks 97th and Palestine ranks 98th of 212 countries.

Montenegro has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Montenegro Palestine Difference Ahead
2010s 0.18 terawatt-hours 0.0767 terawatt-hours 0.1033 terawatt-hours Montenegro
2020s 0.324 terawatt-hours 0.294 terawatt-hours 0.03 terawatt-hours Montenegro

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from solar and wind, Montenegro or Palestine?
Montenegro, at 0.42 terawatt-hours against 0.39 terawatt-hours in Palestine as of 2025.
What is the difference in electricity generation from solar and wind between Montenegro and Palestine?
0.03 terawatt-hours, with Montenegro ahead.
How many years of comparable data are there for Montenegro and Palestine?
8 years are reported by both, from 2017 to 2024.
How do Montenegro and Palestine rank globally for electricity generation from solar and wind?
Montenegro ranks 97th and Palestine ranks 98th of 212 countries.
Where does this data come from?
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar and wind. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Montenegro vs Palestine: Electricity generation from solar and wind. Statizoid, drawing on Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data. Retrieved 01 September 2026, from https://energy.statizoid.com/compare/solar-and-wind-power-generation/montenegro/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/solar-and-wind-power-generation/montenegro/west-bank-and-gaza/">Montenegro vs Palestine: Electricity generation from solar and wind</a> — Statizoid

About this data

Indicator
Electricity generation from solar and wind
Unit
terawatt-hours
Source
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
214 places, 6,906 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.