Tonga vs Trinidad and Tobago: Electricity generation from solar and wind

Tonga
0.01 terawatt-hours
in 2024
Trinidad and Tobago
0.01 terawatt-hours
in 2024
Tonga rank
161st
Trinidad and Tobago rank
161st

Electricity generation from solar and wind over time

  • Tonga
  • Trinidad and Tobago
00.0020.0040.0060.0080.01197119972024

How they compare

Tonga currently reports 0.01 terawatt-hours against 0.01 terawatt-hours in Trinidad and Tobago, a difference of 0 terawatt-hours.

Across all 25 years both countries report, Trinidad and Tobago has been ahead every year.

Tonga ranks 161st and Trinidad and Tobago ranks 161st of 212 countries.

Trinidad and Tobago has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Tonga Trinidad and Tobago Difference Ahead
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2010s 0.003 terawatt-hours 0.005 terawatt-hours 0.002 terawatt-hours Trinidad and Tobago
2020s 0.01 terawatt-hours 0.01 terawatt-hours 0 terawatt-hours

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from solar and wind, Tonga or Trinidad and Tobago?
Tonga, at 0.01 terawatt-hours against 0.01 terawatt-hours in Trinidad and Tobago as of 2024.
What is the difference in electricity generation from solar and wind between Tonga and Trinidad and Tobago?
0 terawatt-hours, with Tonga ahead.
How many years of comparable data are there for Tonga and Trinidad and Tobago?
25 years are reported by both, from 2000 to 2024.
How do Tonga and Trinidad and Tobago rank globally for electricity generation from solar and wind?
Tonga ranks 161st and Trinidad and Tobago ranks 161st of 212 countries.
Where does this data come from?
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar and wind. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Tonga vs Trinidad and Tobago: Electricity generation from solar and wind. Statizoid, drawing on Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data. Retrieved 21 August 2026, from https://energy.statizoid.com/compare/solar-and-wind-power-generation/tonga/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/solar-and-wind-power-generation/tonga/trinidad-and-tobago/">Tonga vs Trinidad and Tobago: Electricity generation from solar and wind</a> — Statizoid

About this data

Indicator
Electricity generation from solar and wind
Unit
terawatt-hours
Source
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
214 places, 6,906 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.