Congo vs Suriname: Electricity generation from solar

Congo
0.01 terawatt-hours
in 2024
Suriname
0.01 terawatt-hours
in 2024
Congo rank
158th
Suriname rank
158th

Electricity generation from solar over time

  • Congo
  • Suriname
00.0020.0040.0060.0080.01200020122024

How they compare

Congo currently reports 0.01 terawatt-hours against 0.01 terawatt-hours in Suriname, a difference of 0 terawatt-hours.

Across all 25 years both countries report, Suriname has been ahead every year.

Congo ranks 158th and Suriname ranks 158th of 214 countries.

Suriname has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Congo Suriname Difference Ahead
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours
2010s 0 terawatt-hours 0.005 terawatt-hours 0.005 terawatt-hours Suriname
2020s 0.004 terawatt-hours 0.01 terawatt-hours 0.006 terawatt-hours Suriname

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from solar, Congo or Suriname?
Congo, at 0.01 terawatt-hours against 0.01 terawatt-hours in Suriname as of 2024.
What is the difference in electricity generation from solar between Congo and Suriname?
0 terawatt-hours, with Congo ahead.
How many years of comparable data are there for Congo and Suriname?
25 years are reported by both, from 2000 to 2024.
How do Congo and Suriname rank globally for electricity generation from solar?
Congo ranks 158th and Suriname ranks 158th of 214 countries.
Where does this data come from?
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Electricity generation from solar
Unit
terawatt-hours
Source
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 7,116 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.