Congo, Republic of vs Trinidad and Tobago: Electricity generation from solar

Congo, Republic of
0.01 terawatt-hours
in 2024
Trinidad and Tobago
0.01 terawatt-hours
in 2024
Congo, Republic of rank
157th
Trinidad and Tobago rank
157th

Electricity generation from solar over time

  • Congo, Republic of
  • Trinidad and Tobago
00.0020.0040.0060.0080.01197119972024

How they compare

Congo, Republic of currently reports 0.01 terawatt-hours against 0.01 terawatt-hours in Trinidad and Tobago, a difference of 0 terawatt-hours.

Across all 25 years both countries report, Trinidad and Tobago has been ahead every year.

Congo, Republic of ranks 157th and Trinidad and Tobago ranks 157th of 210 countries.

Trinidad and Tobago has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Congo, Republic of Trinidad and Tobago Difference Ahead
2000s 0 terawatt-hours 0 terawatt-hours 0 terawatt-hours β€”
2010s 0 terawatt-hours 0.005 terawatt-hours 0.005 terawatt-hours Trinidad and Tobago
2020s 0.004 terawatt-hours 0.01 terawatt-hours 0.006 terawatt-hours Trinidad and Tobago

Averages of every year both report within each decade.

Frequently asked questions

Which has higher electricity generation from solar, Congo, Republic of or Trinidad and Tobago?
Congo, Republic of, at 0.01 terawatt-hours against 0.01 terawatt-hours in Trinidad and Tobago as of 2024.
What is the difference in electricity generation from solar between Congo, Republic of and Trinidad and Tobago?
0 terawatt-hours, with Congo, Republic of ahead.
How many years of comparable data are there for Congo, Republic of and Trinidad and Tobago?
25 years are reported by both, from 2000 to 2024.
How do Congo, Republic of and Trinidad and Tobago rank globally for electricity generation from solar?
Congo, Republic of ranks 157th and Trinidad and Tobago ranks 157th of 210 countries.
Where does this data come from?
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data, published as Electricity generation from solar. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo, Republic of vs Trinidad and Tobago: Electricity generation from solar. Statizoid, drawing on Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data. Retrieved 18 August 2026, from https://energy.statizoid.com/compare/solar-energy-consumption/congo-rep/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://energy.statizoid.com/compare/solar-energy-consumption/congo-rep/trinidad-and-tobago/">Congo, Republic of vs Trinidad and Tobago: Electricity generation from solar</a> β€” Statizoid

About this data

Indicator
Electricity generation from solar
Unit
terawatt-hours
Source
Ember (2026); Energy Institute - Statistical Review of World Energy (2026); Pinto et al. (2023) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
216 places, 7,116 data points, 1920–2025
Last refreshed

Measured in terawatt-hours.